- Monday - Saturday 09.00 AM - 08.00 PM
- 96772 22738 / 99529 56565
P2C4/GEO-2/2019 – Geotechnical Investigations Works from POWER HOUSE Ramp to RAMACHANDRA HOSPITAL of Corridor-4.* (Total Length= 9.01 KM (CH 10027.102 m to CH: 19047.000 m) for ELEVATED CORRIDOR of Phase-II -Chennai Metro Rail Limited”.
P2C4/GEO-3/RT-01/2019 – Geotechnical Investigations from RAMCHANDRA HOSPITAL to POONAMALLEE of Corridor-4 including 400 M of depot approach and depot at Poonamallee. (Total Length= 7.18 KM (CH 19047.000 m to CH: 25829.790 m) for ELEVATED CORRIDOR of Phase-II -Chennai Metro Rail Limited”.
Geotechnical Investigation on outer Ring Road from Central Silk Board Junction to
K.R. Puram Including Baiyappanahalli Depot Entry line for Bangalore Metro Rail Project , Phase – 2A”
Package-3-2024 – Geo-Technical Investigation for the works of Viaduct and Stations from Kanteerava Studio Station to Kempapura Station (Ch: 21.153 Km to Ch:31.172 Km) in Phase 3 line of Bangalore Metro Rail Project”